Fast Tracks Are Great for Model Trains www.fasttracks.org

Hand Laying Track by Soldering PCBs (a short overview)

Posted on

fasttracks

This is a short overview of how I'm hand laying the track for my HOn30 LNI railroad. After the rail is soldered in place, I take it off the layout, glue the wooden ties to it, then prepare it for electrical contact, do a lot of testing, and then glue it all in place. The techniques I'm using here I learned from the fasttracks videos. Search YouTube for them to see the complete HOW-To.
Video Rating: 0 / 5

fasttracks

Comments (2) Trackbacks (0)
  1. @Schmuck804 I ended up moving about 4 months after I started the layout, and gave away what I had to a fellower modeller in the area. However, now that I’m getting settled in, I’ve started some plans for a new mini layout.

  2. Hey nice layout. Any more progress? What are you using for motive power? I have a small HOn30 layout to play with you can see in my upload videos.


Trackbacks are disabled.